Biomass Projects We're Proud Of
From rural domestic installations to large commercial district heating schemes — see how Biomass Engineers Limited has helped clients across the UK reduce energy costs, cut carbon and protect RHI income.
Commercial Hotel — 500 kW Fröling Wood Chip
A rural country hotel replacing an ageing oil system with a 500 kW Fröling wood chip boiler, district heating to main building and three holiday cottages.
Agricultural Estate — 200 kW Hargassner Pellet
A working Dartmoor estate switching farmhouse, workers' cottages and grain drying onto a 200 kW Hargassner pellet boiler with on-site pellet store.
Secondary School — 150 kW Herz Wood Chip
A rural secondary school replacing an ageing gas boiler installation with a 150 kW Herz wood chip boiler — council-funded, full commissioning documentation.
Leisure Centre — 800 kW Heizomat District Heating
A local authority leisure centre served by an 800 kW Heizomat wood chip boiler with district heating loop to pool, gym and café. Planned preventative maintenance contract.
Nursing Home — 100 kW Windhager Pellet Retrofit
A 60-bed nursing home retrofitting a 100 kW Windhager pellet boiler into its existing plant room, minimal disruption to residents during install.
Rural Property — 30 kW Fröling Log Boiler
A working Exmoor farmhouse off the gas grid, replacing oil with a 30 kW Fröling log boiler and thermal store. Fuel store design, flue install, commissioning and Land Energy fuel supply arranged.