The challenge
The school's 1970s gas plant was end-of-life, expensive to run and failing too often. Local authority wanted a low-carbon replacement aligning with its own decarbonisation targets, with a careful project plan working around term times.
A rural secondary school replacing an ageing gas boiler installation with a 150 kW Herz wood chip boiler — council-funded, full commissioning documentation.
The school's 1970s gas plant was end-of-life, expensive to run and failing too often. Local authority wanted a low-carbon replacement aligning with its own decarbonisation targets, with a careful project plan working around term times.
150 kW Herz firematic chip boiler, external chip store, new plant room works within the existing boiler house footprint, integrated with the BMS for central monitoring.
Installation delivered in two stages over the summer and Christmas breaks to avoid disruption. Full commissioning documentation, HETAS compliance pack, and training for site staff and FM contractor completed before handover.
“Delivered on time around our term calendar, with none of the usual contractor drama. The system has been dependable since day one.”