Leisure Centre — 800 kW Heizomat District Heating

A local authority leisure centre served by an 800 kW Heizomat wood chip boiler with district heating loop to pool, gym and café. Planned preventative maintenance contract.

Sector
Public Sector
Boiler Brand
Heizomat
Output
800 kW
Fuel
Wood Chip
Year
2020
Location
South West

The challenge

The pool's gas-fired plant was the largest single source of carbon on the authority's estate. A committed net-zero target and public spending scrutiny drove the project — but the scheme had to cope with 24/7 pool load, peak demand and strict reliability KPIs.

Our solution

800 kW Heizomat wood chip boiler in a new plant room, underground chip store with walking-floor delivery, district heating loop to pool, gym and café. Full BMS integration with the authority's central monitoring.

The installation

Installation delivered over 16 weeks alongside pool maintenance scheduling. Coded welding in-house for all primary circuits. Commissioning ramped over two weeks to stabilise the pool controls.

The outcome

£62,000
Annual Fuel Saving
£48,000
RHI Annual Income
88% vs gas
Carbon Reduction
99.6%
System Uptime

On site

Plant room
Biomass pellets
Industrial pipework
Domestic fuel hopper
★★★★★
A high-stakes, high-visibility project delivered with total professionalism. Two winters in, the numbers have beaten projections.
Facilities Director · South West Leisure Centre

Ready to Book or Get a Quote?

Call the team, drop us an email, or request a callback — we'll get back to you the same working day.